Analysis of installation process of pneumatic diaphragm pump

Views: Update time:2021-01-19

Analysis of installation process of pneumatic diaphragm pump

1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

Analysis of installation process of pneumatic diaphragm pump(圖1)

Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號

主站蜘蛛池模板: 亚洲三级成人 | 婷婷狠狠的狠狠的爱 | 国产精品久免费的黄网站网站专区在线 | 丁香婷婷综合五月综合色啪 | 国产成人一级 | 久久天天躁狠狠躁夜夜躁 | 久久人精品 | 四虎在线免费观看 | 国模视频在线无码 | 婷婷丁香在线 | 国产成人无精品久久久久国语 | 国产欧美日韩精品视频一区二区 | 精选国产一区二区 | 欧美午夜色视频国产精品 | 美女福利视频一区二区 | 日韩精品在线观看免费 | 精品无码一区二区三区爱与 | 欧美一二三区视频免费观看 | 韩国三级日本三级香港三级 | 2024一本久道久久综合狂躁 | 国产91丝袜播放动漫 | 国产香蕉尹人在线视频你懂的 | av资源在线 | 激情踪合| 国产成人精品综合久久久 | 在线精品91com| 成人无码区免费A片视频韩国 | 牛牛天天综合日韩视频影视 | 亚洲综合色网 | 日本一本二本三区免费2024高 | 药水哥探花丁香美女社区 | 国产精品夜色视频一区二区 | 51精品国自产在线 | 日韩国产成人无码AV毛片蜜柚 | 国产视频一区欧美二区日本三区动 | 狼色精品人妻在线视频 | 亚洲国产女人aaa毛片在线 | 欧美亚洲日本一区 | 日韩一区二区三区视频在线观看 | a级毛片部免费观看 | 九九九99品牌的特色产品 |